Tongwei Runyang Yancheng Phase 1
The first collaboration project between Hikvision chassis and Jiejia upper-layer mechanism,
achieving ±2mm docking precision using camera secondary positioning.
Project Overview
Capacity: 4GW (Runyang Phase 1)
Robots Deployed: 34 integrated-type robots
Functions Implemented
• First collaborative project (Hikvision chassis + Jiejia upper-layer mechanism)
• Camera secondary positioning achieves docking precision of ±2mm